AE120 Requirements for Project & Construction Cost Estimating Services |
Federal Facility Criteria (FFC) |
Consider Non-Quantifiable Benefits |
Design Objective |
Construction Phase Cost Management |
Resource Page |
Cost Estimating |
Resource Page |
Cost Estimating |
Design Discipline |
Cost Impact of the ISC Security Design Criteria |
Resource Page |
Cost–Effective |
Design Objective |
Earned Value Analysis |
Resource Page |
Making the Business Case for Resilience Projects |
Continuing Education |
Manual for Preparation of Cost Estimates |
Federal Facility Criteria (FFC) |
Manual for Preparation of Cost Estimates and Related Documents for VA Facilities |
Federal Facility Criteria (FFC) |
NAVFAC MII Template English 2023v1 |
Federal Facility Criteria (FFC) |
OmniClass |
Resource Page |
PBS P-120 Public Buildings Service Cost and Schedule Management Policy Requirements (with PBS 1000.6B) |
Federal Facility Criteria (FFC) |
Setting Escalation Rates Responsibly: FEMP Guidance and the EERC |
Continuing Education |
State Homes Cost Guide |
Federal Facility Criteria (FFC) |
Tri-Service Modified Uniformat - Universal Cost Estimating Format Template |
Federal Facility Criteria (FFC) |
UFC 3-740-05 Construction Cost Estimating |
Federal Facility Criteria (FFC) |
Use Economic Analysis to Evaluate Design Alternatives |
Design Objective |
Utilize Cost and Value Engineering Throughout the Project Life Cycle |
Design Objective |
Value Engineering |
Resource Page |
Working with Your Utility Series: Utility Cost Implications of a Distributed Energy Project |
Continuing Education |
Worksheet for Budget Tracking by Phase (no date; obtained from VA 10/13) |
Federal Facility Criteria (FFC) |
Worksheet for Cost Model - Budget Tracking (no date; obtained from VA 10/13) |
Federal Facility Criteria (FFC) |